- Second bridge over Buroi river opened for public
Biswanath Chariali, 4 Dec2023 :
The second bridge over the Buroi river on NH 15 under Behali LAC was inaugurated for the general public by Sambhir Singh, the director of NHDCL, Sonitpur today. It is to be mentioned here that the contract for construction of the four lane road from Biswanath Chariali to Gohpur was sanctioned to TK Engineering, an Arunachal Pradesh based construction company in 2015. But the construction company failed to complete the four lane construction works within the stipulated time frame. The time period of T.K Engineering Company was completed in2020. Similarly, the construction work was given to Dhatarwal Construction Company Pvt.Ltd (DCC).
Leave a Reply Cancel reply